275 Kent Street, Sydney

Projects Highlight in Australia

Commercial office space across 30 plus floors adjacent to the Barangaroo Precinct. The building upgrade is required in order to meet the current 5 Star Green Star requirements.

BUILDER: MPA Projects Pty Ltd

PURPOSE AND SIZE: Commercial Tower Refurbishment: 35,000 m²

COMPLETION DATE: Approx 2018

PROJECT DURATION: 2 years

ACCESS FLOOR SYSTEM USED: Reuse existing T3 & T4 ASP Floor System Installation of New Steel Cementitious Ultrafix stringerless system with a 3.0Kn loading at 150mm FFH Product Code: SC-3.0-UF

Installation of Steel Cementitious HPL Rigid Grid System with a 4.5kN loading at 1500mm FFH

Product Code:
SC-4.5-RG-HPL

PROJECT FEATURES AND HIGHLIGHTS:

The Tower Refurbishment will be a combination of executive and standard open-plan offices. ASP Access Floors met their Green Star requirements by having the appropriate sealants and adhesives being used in this project, in conjunction with low formaldehyde-based laminate products to the HPL Floor within their Comms Rooms.

In conclusion, ASP Access floors were able to provide our Environmental Product Declaration (EPD) of our access floor system. This in turn was a huge bonus for MPA to meet their Green Star requirements. This was the first project ASP was able to offer our EPD Declaration to our clients.