Australia

Equinix Data Centre

Equinix Data Centre Projects Highlight in Australia The Equinix Data Centre, once all stages are complete, is a large project in the technology and telecommunications world. A thorough understanding of data center equipment and functionality was required in order to deliver a successful access floor. Common issues like high rolling load areas, zinc whisker elimination, […]

Equinix Data Centre Read More »

Australian International School, Singapore

Australian International School, Singapore Projects Highlight in Australia The project was intended to be environmentally friendly and, thus, sustainable to coincide with the school’s intentions of an ‘eco-friendly working environment’ ensuring AIS students are in the best environment to exceed the school’s expectations and their own. ASP’s ultra fix system fits the scope required as

Australian International School, Singapore Read More »

Brisbane Supreme Courts

Brisbane Supreme Courts Projects Highlight in Australia CLIENT: Brisbane Supreme Courts BUILDER: Lend Lease PURPOSE AND SIZE: Courts: 25,000 m² COMPLETION DATE: March 2012 PROJECT DURATION: 14 months ACCESS FLOOR SYSTEM USED: Steel Cementitious, Rigid Gird 6.6 kn- prefinished in specialty timber. HPL System. B2-11 800850 mm FFH. PROJECT SCOPE/SPECIFICATION: – The concept of a “comfortable and healthy building” working with natural

Brisbane Supreme Courts Read More »

161 Castlereagh Street, Sydney

161 Castlereagh Street, Sydney Projects Highlight in Australia Sustainability was at the heart of the design of 161 Castlereagh Street. ASP’s Ultrafix system offered a sustainable, cost-effective and functional solution. CLIENT: ANZ and Freehills BUILDER: Built Holdings PURPOSE AND SIZE: Base Build Office Fit Out: 15,800 m² COMPLETION DATE: October 2014 PROJECT DURATION: 6 Months ACCESS FLOOR SYSTEM USED: Steel Cementitious

161 Castlereagh Street, Sydney Read More »

570 Church Street, Melbourne

570 Church Street, Melbourne Projects Highlight in Australia A creative approach to solving issues with existing floors in heritage buildings across 8,000 m² of office space in the heart of Melbourne’s suburb of Richmond. CLIENT: Emleigh Pty Ltd BUILDER: Hacer Group Pty Ltd PURPOSE AND SIZE: Base Build Office Fitout COMPLETION DATE: March 2017 PROJECT DURATION: 6 Months ACCESS FLOOR

570 Church Street, Melbourne Read More »

C7 Aurecon

C7 Aurecon Projects Highlight in Australia CLIENT: Aurecon BUILDER: Lend Lease PURPOSE AND SIZE: Office Fitout: 16,000 m² COMPLETION DATE: October 2012 PROJECT DURATION: 5 months ACCESS FLOOR SYSTEM USED: Supply and installation of ASP Ultra Cementitious medium grade access floor system. We offer the SC – 64 – 3.7 – UF grade panel with a bare finish ready for carpet

C7 Aurecon Read More »

Mediaworks Media Studio

Mediaworks Media Studio Projects Highlight in New Zealand CLIENT: Mediaworks BUILDER: Hawkins Construction PURPOSE AND SIZE: 600 m² COMPLETION DATE: February 2020 PROJECT DURATION: 3 months ACCESS FLOOR SYSTEM USED: SC Ultra Fix @ 150mm FFL (RF-01) SC HPL @ 400mm FFL (RF-02). PROJECT SCOPE/SPECIFICATION: 1. Supply and Installation of ASP ICON X Raised Access Floor system @ 3.0kN 150mm

Mediaworks Media Studio Read More »

Box Hill Institute

Box Hill Institute Projects Highlight in Australia ASP Access Floors worked with Cockram Constructions to provide an efficient, environmentally friendly raised access floor system within a modern learning environment. CLIENT: Box Hill Institute BUILDER: Cockram Constructions PURPOSE AND SIZE: University: 2,500m² COMPLETION DATE: September 2013 PROJECT DURATION: 10 Months ACCESS FLOOR SYSTEM USED: Steel Cementitious Ultra Fix system with a 3.0Kn

Box Hill Institute Read More »

Scroll to Top