20 Martin Place, Sydney

Projects Highlight in Australia

The ASP Access Floor system installed in 20 Martin Place offers the tenants long-term economic, functional, and sustainable benefits.

CLIENT: Pembroke Property

BUILDER: Built Holdings

PURPOSE AND SIZE: Base Build Office Fit Out: 15,800m²

COMPLETION DATE: October 2014

DURATION: 6 Months

KEY FEATURES AND BENEFITS: 20 Martin Place applies contemporary thinking and environmentally sustainable design to deliver tangible long-term economic and tenant benefits. As such it has been awarded a 6 Star Green Star – Office As Built v3 certified rating, from the Green Building Council of Australia.

Over 15,000m2 of access flooring was installed throughout the buildings 21 floors of office and retail space.

ACCESS FLOOR SYSTEM USED: Steel Cementitious Ultra fix stringerless system with a 3.0kN loading at 150mm FFH
Product Code: SC-3.0-UF