Equinix Data Centre

Projects Highlight in Australia

The Equinix Data Centre, once all stages are complete, is a large project in the technology and telecommunications world. A thorough understanding of data center equipment and functionality was required in order to deliver a successful access floor. Common issues like high rolling load areas, zinc whisker elimination, and air and duct requirements all were addressed in this project.

CLIENT: Equinix

BUILDER: John Holland Group

PURPOSE AND SIZE: Data Centre: 4,000 m²

COMPLETION DATE: June 2011

PROJECT DURATION: 6 Months

ACCESS FLOOR SYSTEM USED: Steel Cementitious HPL Rigid Grid system 4.5Kn Heavy Grade and 6.6kN Industrial Grade loading at 1500mm FFH
Product Code: SC-64-4.5-RG-HPL and SC-64-6.6-RG-HPL

KEY FEATURES AND BENEFITS: The corridors in this project were classed as high rolling load areas and so our 6.6kN Industrial Grade access floor panels were used. ASP Access Floors specially designed bridging stringers were used in corridors to span a width of 1.8m unsupported and carrying a panel load of 6.6kN. The bridging was re-engineered and project-specific so that it could be incorporated into our flooring system.
All understructure components were finished with a hot-dipped galvanized finish eliminating the problem of zinc whiskers commonly found in data centers. Other ASP accessories such as air grilles along with factory and site cutouts were used on this project.