Telstra Data Centre Clayton, Victoria

Projects Highlight in Australia

The new Telstra Data Centre and Switch Room utilized a super industrial grade access floor to deliver ease of moving switchboards and UPS units during construction and over the life of the data center.

CLIENT: Telstra

BUILDER: Lend Lease

PURPOSE AND SIZE: B Data Centre: 2,000 m²

COMPLETION DATE: December 2010

DURATION: 6 Months

ACCESS FLOOR SYSTEM USED: Steel Cementitious HPL Rigid Grid System with an 11kN loading at 950mm FFH
Product Code: SC-64-11-RG-HPL

PROJECT FEATURES AND HIGHLIGHTS: The specification contained special requirements which saw the need for some of the ASP products to be specially designed to meet project requirements. In the specification, the air grilles required a 100% damper shut-off. Also, the earthing requirements saw the need for a continuous connection from the panel right through to the pedestal base.
The project did however present some installation challenges due to the large quantity of switchboards. The self-supporting switchboards required a multitude of cuts in the access floor and so ASP utilized our 1200mm and perimeter stringers to support these cuts.

If You Have Any Questions,
Call Us on (+64) 9 579 4799

or fill in our enquiry form and we will endevour to be in touch in the next 24 hours.

Please enable JavaScript in your browser to complete this form.
Scroll to Top