CLIENT: SkyCity Casino

BUILDER: Naylor Love Construction Limited

PURPOSE AND SIZE: 540 m²

COMPLETION DATE: March 2020

PROJECT DURATION: 6 Weeks

ACCESS FLOOR SYSTEM USED:

ASP Icon X System @ 9.0kN 150mm FFL – 450 FFL
ASP Urban Interlock System @ 9.0kN 150mm FFL – 450 FFL

PROJECT SCOPE/SPECIFICATION:

  • Supply and installation of 9.0kN Icon X bare paneled access floor to RF01.
  • Supply of installation of Braced Pedestals for Seismic compliance to PS1.
  • Supply and installation of 9.0kN Urban Interlock access floors to RF02.

PROJECT FEATURES AND HIGHLIGHTS:

  • Installation on existing bitumen expoxy for warranty.
  • Underfloor fire baffles & fyre boxes.