CLIENT: Mediaworks
BUILDER: Hawkins Construction
PURPOSE AND SIZE: 600 m²
COMPLETION DATE: February 2020
PROJECT DURATION: 3 months
ACCESS FLOOR SYSTEM USED:
SC Ultra Fix @ 150mm FFL (RF-01)
SC HPL @ 400mm FFL (RF-02).
PROJECT SCOPE/SPECIFICATION:
1. Supply and Installation of ASP ICON X Raised Access Floor system @ 3.0kN 150mm FFL to Ground Floor Level (RF-01) with Neoprene Pedestal Pads and Perimeter strips.
2. Supply and Installation of ASP Concept + HPL System @ 9.0kN 400mm FFL Raised Access Floor system to Ground Floor Level Line Room (RF-02).
3. Supply and Install 155 M2 of Farrat Acoustic Flooring isolators and Perimeter Isolation strips.
PROJECT FEATURES AND HIGHLIGHTS:
– Neoprene rubber pads were installed under each standard & seismic pedestal for acoustic purposes
– 400mm FFL & 150mm FFL seismic pedestals.