Dunedin Chief Post Office
- Home
- Dunedin Chief Post Office
Projects Highlight in New Zealand
CLIENT: Silver Fern Farms – NZ Head Office
BUILDER: ASP Access Floors NZ Limited
PURPOSE AND SIZE: 4500 m²
COMPLETION DATE: January 2014
PROJECT DURATION: 10 Weeks
ACCESS FLOOR SYSTEM USED: SC Ultra Fix @ 400mm FFL
PROJECT SCOPE/SPECIFICATION: NZ Registered Heritage Building – The original Raised Timber on joist Flooring had rotted and was replaced with ASP Raised Access Floor.
PROJECT FEATURES AND HIGHLIGHTS: This Heritage Building (Built 1931) in Dunedin’s (NZ) Main Street was in a derelict condition and had been unoccupied for approximately 16 years until a visionary developer purchased it.
The existing raised Timber flooring had rotted and over the years was removed and replaced with an ASP Raised Access Floor.
The 3 x Floors where Raised Access Floor was installed is now the HQ of New Zealand’s Primary meat exporting Company Silver Fern Farms