570 Church Street, Melbourne
Projects Highlight in Australia
A creative approach to solving issues with existing floors in heritage buildings across 8,000 m² of office space in the heart of Melbourne’s suburb of Richmond.
CLIENT: Emleigh Pty Ltd
BUILDER: Hacer Group Pty Ltd
PURPOSE AND SIZE: Base Build Office Fitout
COMPLETION DATE: March 2017
PROJECT DURATION: 6 Months
ACCESS FLOOR SYSTEM USED: Steel Cementitious 3.0kN Ultra Fix System, Steel Cementitious 3.0kN Rigid Grid System, Calcium Sulphate Interlock System in the amenities, and Steel Cementitious 4.5kN Rigid Grid HPL System.
KEY FEATURES AND BENEFITS: 570 Church Street was a redevelopment of the existing heritage-listed building to achieve a 4 Star NABERS and 5 Star Green Star Rating.
An access floor solution in this heritage building provided the client a solution for a level surface after decades of various floor finishes having been applied to the existing heritage floor.
ASP engineered a solution to the ground floor area with a double-height access floor system installed utilizing our Rigid Grid System.