P: + 64 9 579 4799
E: sales@aspfloors.co.nz

Advanced Flooring Systems for buildings of the future

Westpac Head Office, Sydney

Projects Highlight in Australia

logo gold

 

Westpac Head Office, Sydney

Provide an access floor for the purpose of distributing cables/ data and power throughout the building without the need for cable trays.

Provide computer room floors to several IT and Comms rooms throughout the building.

Westpac Head Office Sydney big  Westpac Head Office Sydney 2

 

Client: Westpac


Builder: Leighton Contractors


Purpose & Size: Commercial: 72,000 m²                        


Duration: 14 Months


Completed: October 2009

 

Westpac Head Office Sydney 3 

Access Floor System Used:
RAF 01 – SC4.5 Bare Panel
FAF 02 – SC4.5 HPL Rigid Grid system
Project Features and Highlights:
Greater adaptability from 150mm access floors allowing easy reconfiguration of work areas for fit out flexibility and connectivity. ASP supplied the floor boxes with power and data sockets to the project specifications.