Canterbury RSL Club Upgrade

Projects Highlight in Australia

logo gold

 

Canterbury RSL Club Upgrade

Refurbishment and upgrade to existing RSL Club, completion over eight stages to improve flexibility for the club’s gaming requirements.

Refurbishment of existing RSL Club with the introduction of underfloor air-conditioning to associated areas – 2,100 m²

 

Builder: MPA Projects Pty Ltd


Purpose & Size: Refurbishment of existing RSL Club with the introduction of underfloor air-conditioning to associated areas – 2,100 m²

 

Approximate Completion Date:  2018


Approximate + Project Duration: Approx 2 years



 

Canterbury RSL Club Upgrade big

Project Scope/Specification:
Refurbishment and upgrade to existing RSL Club, completion over eight stages to improve flexibility for the club’s gaming requirements.


Access Floor System Used:
Installation of New Steel Cementitious Ultrafix stringerless system with a 9.0kN loading at a combined 120 and 500mm FFH, with S1/S2 and S5/S6 pedestals. Product Code: SC-9.0-UF

Project Features and Highlights:
The club refurbishment will allow for open planned flexibility for relocation of gaming equipment. There will be a combination of different floor requirements introduced for the installation of under floor air-conditioning to associated areas, in order to meet the current Green Star and Club requirements.
The floor being a 9.0kN panel will provide added strength for equipment to be moved freely without the requirement for added protection.