aspfloorssoadmin

Box Hill Institute

Box Hill Institute Projects Highlight in Australia ASP Access Floors worked with Cockram Constructions to provide an efficient, environmentally friendly raised access floor system within a modern learning environment. CLIENT: Box Hill Institute BUILDER: Cockram Constructions PURPOSE AND SIZE: University: 2,500m² COMPLETION DATE: September 2013 PROJECT DURATION: 10 Months ACCESS FLOOR SYSTEM USED: Steel Cementitious Ultra Fix system with a 3.0Kn […]

Box Hill Institute Read More »

1 Bligh Street, Sydney

1 Bligh Street, Sydney Projects Highlight in Australia 1 Bligh Street Sydney is a modern high-rise office tower achieving the 6 star Green Star accreditation rating. Its circular external shape along with its unusual curved atrium provided ASP Access Floors with a challenging but rewarding project. Multiple floor finishes throughout the building added to the

1 Bligh Street, Sydney Read More »

Canterbury RSL club upgrade

Canterbury RSL Club Upgrade Projects Highlight in Australia Refurbishment and upgrade to existing RSL Club, completion over eight stages to improve flexibility for the club’s gaming requirements. Refurbishment of existing RSL Club with the introduction of underfloor air-conditioning to associated areas – 2,100 m² BUILDER: MPA Projects Pty Ltd PURPOSE AND SIZE: Refurbishment of existing RSL Club

Canterbury RSL club upgrade Read More »

ANZ Centre

ANZ Centre Projects Highlight in Australia CLIENT: ANZ BUILDER: Bovis Lend Lease PURPOSE AND SIZE: Commercial: 83,550 m² COMPLETION DATE: end 2009 PROJECT DURATION: 12 Months ACCESS FLOOR SYSTEM USED: Steel Cementitious 4.5kN Heavy Grade Load on an Ultrafix Stringerless Air Tight Understructure. System Code: SC-64-4.5-UF-AT PROJECT SCOPE/SPECIFICATION: The ANZ project required an Air Tight access floor system with smoke and zone

ANZ Centre Read More »

SkyCity Casino

Sky City Casino CLIENT: SkyCity Casino BUILDER: Naylor Love Construction Limited PURPOSE AND SIZE: 540 m² COMPLETION DATE: March 2020 PROJECT DURATION: 6 Weeks ACCESS FLOOR SYSTEM USED: ASP Icon X System @ 9.0kN 150mm FFL – 450 FFL ASP Urban Interlock System @ 9.0kN 150mm FFL – 450 FFL PROJECT SCOPE/SPECIFICATION: – Supply and

SkyCity Casino Read More »

Scroll to Top